Colchester, Connecticut

3560 Capital Outlay

Board of Education Regular Meeting 5:30 PM

← Document Library

policy FY 2024-25 BoardDocs (BOE meetings) 2025-02-11

Machine-extracted text of a publicly posted document, provided for reference and search. The original document at the link above is authoritative.

2/10/25, 3:48 PM                                                           BoardDocs® LT




      Book                           Policy Manual

      Section                        3000 - Business & Non-Instructional Operations

      Title                          Capital Outlay

      Code                           3560     3100.1

      Status                         Active

      Adopted                        March 13, 2001




                                                                 CAPITAL OUTLAY



      Except for emergencies or reasons of economy, the purchase of major pieces of equipment such as vehicles shall be
      scheduled so that annual budgetary appropriations for capital outlay will be of similar size or will show a continuous trend
      without severe fluctuations.

      A long-range and short-range plan for capital outlay shall be developed by the Superintendent of Schools and the Board of
      Education budget committee in order to prevent severe fluctuations in the annual capital outlay fund, and to provide an
      orderly process for acquisition of needed equipment and facilities within budgetary constraints. This long and short-range
      plan shall be submitted with the annual budget.




https://go.boarddocs.com/ct/colchester/Board.nsf/Private?open&login#                                                                 1/1