Colchester, Connecticut

Capital Budget Submission FY 2022-2025 3yr DRAFT - Reductions 2 (1)

BOE Budget Committee Meeting 9:00AM

← Document Library

budget FY 2021-22 BoardDocs (BOE meetings) 2022-02-03

Machine-extracted text of a publicly posted document, provided for reference and search. The original document at the link above is authoritative.

COLCHESTER PUBLIC SCHOOLS
                       FY 2022-2023 CAPITAL BUDGET SUBMISSION 3-YEAR PROJECTION
                                                                                     Draft 2/1/2022

DISTRICT WIDE                                                           FY 2022/23     FY 2023/24     FY 2024/25
Capital Reserve Contribution                                             (150,000)      (150,000)       (75,000)
TOTAL                                                                    (150,000)      (150,000)       (75,000)
BACON ACADEMY
Roof Repairs – Multiple Locations & Outbuildings                          (14,000)          (7,500)      (7,500)
Fire Pump Major Repairs
Fire Alarm Analog Replacement                                                             (53,813)      (53,813)
Cafeteria and Hallway Lighting. Replace Fluorescent Fixtures with LED     (10,000)         (5,000)
Parking Lot LED Lighting                                                  (11,000)        (25,000)      (15,000)
HVAC Repairs
Interior Painting                                                          (9,000)         (6,500)       (6,500)
TOTAL                                                                     (44,000)        (97,813)      (82,813)
WILLIAM J. JOHNSTON MIDDLE SCHOOL
TOTAL                                                                          (0)              (0)          (0)

JACK JACKTER INTERMEDIATE SCHOOL
Retention Wall and Railing. Front of School                                (7,500)
HVAC AC Coil Replacement
Replace Classroom Furniture                                                                (5,000)       (5,000)
Carpet Replacement                                                        (30,000)        (12,000)      (12,000)
Cafeteria and Gym Lighting. Replace Fluorescent Fixtures with LED         (12,000)         (5,000)       (5,000)
Floor Finishing Replacement                                               (37,000)
TOTAL                                                                     (86,500)        (22,000)      (22,000)

COLCHESTER ELEMENTARY SCHOOL
Energy Management System for HVAC                                              (0)        (50,000)      (50,000)
MDF Room HVAC Replacement
Carpet Replacement                                                        (20,000)        (15,000)      (15,000)
Cafeteria and Gym Lighting. Replace Fluorescent Fixtures with LED         (10,000)         (5,000)       (5,000)
Floor Finishing Replacement
TOTAL                                                                     (30,000)        (70,000)      (70,000)

SUMMARY:
DISTRICT WIDE                                                            (150,000)       (150,000)      (75,000)
BACON ACADEMY                                                             (44,000)        (97,813)      (82,813)
WILLIAM J. JOHNSTON MIDDLE SCHOOL                                              (0)             (0)           (0)
JACK JACKTER INTERMEDIATE SCHOOL                                          (86,500)        (22,000)      (22,000)
COLCHESTER ELEMENTARY SCHOOL                                              (30,000)        (70,000)      (70,000)

GRAND TOTAL                                                              (310,500)       (339,813)     (249,813)