CPS Long-Range
Capital Improvement Plan
BOE Meeting 6/8/2021
Phase 1: Roofs & HVAC Systems Across District
This report is the first installment of the CPS Long-range Capital Improvement
Plan (CIP) focusing only on the short and long-term needs of the districts roofs
and HVAC systems. Over the next 2-3 years Mario Hurtado and his team will
create similar plans for all maintenance systems, equipment, and
furniture/hardware throughout the district.
The recommendations in these plans will establish both short term areas of
urgency, and an understanding of the long-term financial implications so CPS, the
BOE, and town can prepare accordingly.
Bacon Academy - Short Term
● Oil Tank replacement, remediation and aesthetics - $200-300,000
● HVAC repair/replace as needed
● Kitchen equipment - dispose and repair
● Roof - Repairs for current FY $29,000, on-going $15-25,000
○ Can make due for 5-10 years
○ Roof at End of Life
○ Regular maintenance deferred for years, lack of funding
Bacon Academy - Long Term 8-10 Years
● HVAC equipment, supplies and installation $6.5 to 7.0 million
● New Roof - 30 Year warranty $3.5 million (63% grant funded)
● Carpeting & flooring, painting, window treatments, bathrooms
● Driveway, parking lot, pavers along bus lanes
● Fields,field drainage, tennis courts, field house
● Other: doors, door hardware, wiring, ceiling repair, comprehensive interior
painting
● Kitchen design and refurbishment
● Interior Lighting
● Exterior Lighting
● BMS-EMS
Bottom Line
● Need to fund immediate needs for repairs/replace to bring to baseline
● Need to fund regular preventative maintenance now and on-going to lengthen
life of many systems and roofing
● Need to fund future expenses now to avoid major funding peaks and more
expensive repairs
● Need to plan for major building project at Bacon Academy 5-10 years (if
immediate and regular maintenance funded)
WJJMS
● Recommend adding $10,000 to reserves in next FY and then stepping up to
$20,000 within 5 years for mechanical repairs and roofing PM
JJIS
● 4 years remaining on roof warranty
● $9,000 per year in roof PM
● Two options for roof:
○ Wait until end of life in 10 years and replace fully @ $3,000,000 with 30 year warranty
(63%)
○ Recondition sections of roofing for 20 year warranty, $100,000-$150,000 per section,
can be done over time every 2 years starting in 2 years, for 5-10 years (no grant %)
● See last slide
CES
● Roof in good condition, needs regular maintenance
● $5,000-10,000 per year
● See last slide
Recommended Immediate Action: EOY & ARPA Funding
EOY Funding (transfer from electricity line):
● Bacon Academy $80,000
● WJJMS $10,000 Reserves
● JJIS $50,000 Roof & mechanical repairs
● CES $50,000 Roof & mechanical repairs
ARPA Funding $500,000 HVAC repair & replacement for 3 buildings